We fetched it down and into the tent where work was soon started. It was very obvious that this was not going to be a quick hit! Fresh water is very harmful to wooden boats and all of Gwalch's decking, deckbeams and floorbeams were rotten from it. Many, many, ribs were needing replacement, the stem was de-laminating (a previous repair) and the transom was shot |
||||||||||||
![]() |
||||||||||||
![]() |
||||||||||||
|
We towed it down to Deganwy for Prom Day and afterwards got it well supported in the tent and have got on with the work. |
||||||||||||
![]() |
||||||||||||
![]() |
||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Alun Simpson's shed is a veritable goldmine for tools etc. but we have been missing a suitable bandsaw for cutting things like oak beams. We think we have this in hand ......... |
|
CODBLOG 5 : Gwalch -- The Work Progresses |
|
|
|
|
|
There is a big "plank" in the bottom of the boat called the "keelson". This had to come out to expose the floor beams below. A combination of rainwater in the bottom of the boat and steel fixings in the original construction had rotted six of the floor beams in the centre of the boat. These had to come out and new ones made. |
![]() |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||
|
|
![]() |
||||
![]() |
||||
|
CODBLOG 9 --- COD Centenary Project --- Ribbing Continues on GWALCH |
![]() |
||||||||||||
|
We are now passed the halfway point with the re-ribbing of Gwalch with 24 done already. Following instructions from Arthur, Keith and I have cracked on with it. We have now drawn Neil Roobottom and Neil Appleton into the "ribbing team" and we are romping away with it! |
||||||||||||
![]() |
||||||||||||
|
In a previous life as an Industrial Engineer, I would have set a Standard Time of under one hour per rib and expected 8 ribs a day from a pair of operators. In Nissan we'd have probably done twice that! However, in our declining years our pace of work and recovery time is somewhat extended and one rib a day feels like a good days work --- certainly worthy of a celebratory pint afterwards! |
||||||||||||
![]() |
||||||||||||
|
Our timber merchant has come up with a chunk of oak suitable for the stem. The grain has to follow the curve of the stem so the wood has to have been grown like that. They managed to get 2 slices out of the section so we have the wood to make new stems for both Gwalch and Kandahar. These large, banana-shaped pieces will certainly take some whittling down. |
||||||||||||
|
CODBLOG10: - Gwalch’s Back End |
![]() |
||||||||
|
The old transom was shot so a suitable slab of new wood was purchased from our friendly woodyard in Trefnant. Using the old transom as a template Rod cut a new one to shape on the bandsaw. I think he's getting quite adept at bandsawing as it turned out to be a very good fit. The practice will be useful as we have a lot more parts to cut out! |
||||||||
![]() |
||||||||
|
The edges had to be chamfered and this was done with an electric planer and then the new transom was offered up to the boat. It was looking pretty good and only a little more planing was needed before we could clamp it to position. |
||||||||
|
|
||||||||||||||||||||||||
|
CODBLOG11: The New Stem |
|
|
||||||||||||||||||||
|
|
||||||||||||||||||||||
![]() |
||||
![]() |
||||
|
CODBLOG12: Ribs good to go |
|
|
|
||||||||||||||||||||||
|
CODBLOG13: A VIP Visit |
|
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
CODBLOG15: Up to deck level at last. |
|
|
|
|
||||||||||||||||||||||||||||||||||||
|
CODBLOG16: Deck Beams.. |
|
|
||||||||||||||||||||||||
|
|
|
||||||||||||||
|
CODBLOG17: Storm Damage |
|
|
|
|
|
|